WETA BY THE NUMBERS

HUMANPOWER
IT staff: 35
Visual f/x staff: 420

HARDWARE
Equipment rooms: 5
Desktop computers: 600
Servers in renderwall: 1,600
Processors (total): 3,200
Processors added 10 weeks before movie wrapped: 1,000
Time it took to get additional processors up and running: 2 weeks
Network switches: 10
Speed of network: 10 gigabits (100 times faster than most)
Temperature of equipment rooms: 76 degrees Fahrenheit
Weight of air conditioners needed to maintain that temperature: 1/2 ton

STORAGE
Disk: 60 terabytes
Near online: 72 terabytes
Digital backup tape: 0.5 petabyte (equal to 50,000 DVDs)

OUTPUT
Number of f/x shots: 1,400
Minimum number of frames per shot: 240
Average time to render one frame: 2 hours
Longest time: 2 days
Total screen time of f/x shots: 2 hours
Total length of film: Rumored to be 3.5 hours
Production time: 9 months